    Part 13 of 13 in Thirteen Records. The long article, Data Centers Don’t Have an Environmental Record. They Have Thirteen of Them., rates thirteen kinds of environmental complaint against data centers. This series takes them one at a time.

    I work at a local ISP in Northern Illinois and co-founded FD-IX, an internet exchange. I have no customer, vendor, or interconnection relationship with any facility or developer named here and no financial position in any of them beyond broad-market index funds. My industry grows with infrastructure investment in a general way, which is an indirect interest; the full disclosure is at the top of the complete article.


    The last of the thirteen records is the one with the least to do with the building. Fiber carries no power-frequency current. Network copper carries signal at low power. The 60 Hz fields neighbors ask about come from the substation, transformers, switchgear, and conductors that serve any large load, and the same substation would serve a plant, a hospital, or a subdivision.

    That makes EMF a Selective concern as applied to data centers and a Contested one as applied to power lines, and this post rates it both ways. The science is not settled in either direction: IARC’s “possibly carcinogenic” classification from 2002 rests on a childhood leukemia association, the exposure guidelines were built to prevent acute nerve stimulation and not to address that association, and Illinois has no statewide numeric limit. Calling the concern fabricated overstates the case against it as much as calling it proven overstates the case for it.

    How the ratings work. Each complaint below is stated the way it usually arrives at a hearing and rated on the scale the full article uses. Systemic: documented at compliant facilities across multiple geographies. Regional: real, but only under specific geographic or operational conditions. Isolated: documented at one or few facilities due to misconduct or atypical design. Exaggerated: the concern is real, but the figures are permit ceilings or worst cases, not operating norms. Selective: a legitimate concern applied only to data centers, not to comparable land uses. Misattributed: the harm is real, but the source, geography, or cause is wrong. Contested: a plausible mechanism exists, but causal documentation at compliant facilities does not. Fabricated: no credible evidentiary basis exists. Where I say I found no record of something, that means a search of public sources through October 2026, not paid databases or records requests.


    Electromagnetic Fields

    Claim: The data center will expose neighbors to dangerous EMF. Tier: Selective. The source is power infrastructure, not the data center.

    Fiber carries no power-frequency current, and network copper carries signal current at low power. The 60 Hz fields come from the substations, transformers, switchgear, and high-current conductors that serve any large load: a plant, a hospital, a distribution center, or the substation serving a subdivision. [34]

    Claim: Power-line EMF causes cancer. The reverse claim: EMF concerns are made up. Tier for both: Contested.

    IARC classified extremely low frequency magnetic fields as possibly carcinogenic (Group 2B) in 2002, based on associations between long-term residential exposure and childhood leukemia. [35] ICNIRP’s 2010 guidelines set public reference levels at 2,000 milligauss to prevent acute nerve stimulation, not from a risk assessment of long-term low-level exposure. ICNIRP calls the leukemia evidence “too weak to form the basis for exposure guidelines” while acknowledging pooled analyses that “indicate that an excess risk may exist for average exposures exceeding 0.3 to 0.4 µT,” 3 to 4 milligauss, about three orders of magnitude below the reference level; WHO says the evidence is not strong enough to be considered causal. [34][35a] The United States has no federal limit. Six states set numeric limits for power-line fields and five apply “prudent avoidance”; Illinois was in neither group in the 2018 international comparison, which covers statewide standards, not conditions the Illinois Commerce Commission may attach to a siting order. [36] The signal exists, the standards were not built to address it, and none of it is specific to data centers. Calling it fabricated overstates the case against it as much as calling it proven overstates the case for it.


    What to ask for. Ask where the power comes from and what it requires. In my experience, a campus at this scale rarely connects to existing distribution. It typically needs a new substation, switchyard, transmission upgrades, and easements, and those are sited and permitted separately, often by the utility and the Illinois Commerce Commission rather than the municipality. In the applications I reviewed, the EMF question and the visual and environmental footprint of that infrastructure did not appear. Require the applicant to identify the interconnection plan and the off-site work at the time of approval, so the council is evaluating the whole project and not just the building. Where a substation or new line will sit near homes, ask whoever designs it, the applicant or the utility, for the calculated magnetic field at the nearest homes, with the load and averaging assumptions stated. Residents will have read the 3 to 4 milligauss figure from the pooled leukemia analyses. [34][35a] That figure describes average long-term exposure in a home, in studies that show an association and not a cause. It is not a safety limit, and a property-line calculation is not the same measurement, so the useful answer says how the expected household exposure compares with it and on what assumptions.

    Where the series ends. Thirteen records, one building type, and no uniform verdict. Four of the thirteen hold at compliant facilities everywhere: construction disruption, lighting’s effect on wildlife, farmland conversion, and the wastewater stream from evaporative cooling. One, infrasound, has no evidentiary basis. The rest turn on grid, climate, hydrology, design, or distance, and on whether the person making the claim carried those conditions with it. What the imported cases from Virginia, Arizona, Oregon, Tennessee, and Georgia carry to Illinois is less their harm than their gaps: no cumulative generator review, no required pre-construction well test, no state or county rule requiring an acoustic baseline, where only cities such as Yorkville and Aurora have written one, and a vesting clause that can freeze out whatever the city learns next. Before the next approval vote, put three things in the record: the baselines, measured before ground is broken; the corridor-wide estimates of generator emissions and water demand; and enforceable limits on water, noise, and generator operation that the vesting clause does not freeze. The next dispute then gets settled with a measurement.

    This is part 13 of 13 in Thirteen Records, a series that takes the long article Data Centers Don’t Have an Environmental Record. They Have Thirteen of Them. one topic at a time. Previous: chemical hazards. The full article also covers where the industry, the opposition, regulators, and local government each get it wrong, and collects every condition above in one checklist.

    Cover photo: Ron Clausen / Wikimedia Commons, CC0


    Citations

    [34] International Commission on Non-Ionizing Radiation Protection, “Guidelines for Limiting Exposure to Time-Varying Electric and Magnetic Fields (1 Hz to 100 kHz),” Health Physics, Vol. 99, No. 6, pp. 818-836, 2010. This is the current ICNIRP primary guideline for extremely low frequency fields, superseding the 1998 up-to-300-GHz guideline for this frequency range. Reference levels at 50/60 Hz: 200 microtesla (2,000 milligauss) general public, 1 millitesla (10,000 milligauss) occupational. Read directly: Table 4 general public reference level 2 x 10^-4 T and Table 3 occupational 1 x 10^-3 T at 50 to 400 Hz; “It is the view of ICNIRP that the currently existing scientific evidence that prolonged exposure to low frequency magnetic fields is causally related with an increased risk of childhood leukemia is too weak to form the basis for exposure guidelines”; pooled analyses “indicate that an excess risk may exist for average exposures exceeding 0.3-0.4 µT”; the only well-established effects in volunteers are nerve stimulation and retinal phosphenes. https://www.icnirp.org/cms/upload/publications/ICNIRPLFgdl.pdf (archived: https://web.archive.org/web/20261012204141/https://www.icnirp.org/cms/upload/publications/ICNIRPLFgdl.pdf). Milligauss figures are direct conversions of ICNIRP’s 200 µT and 1 mT (1 µT = 10 mG).

    [35] International Agency for Research on Cancer, IARC Monographs on the Evaluation of Carcinogenic Risks to Humans, Volume 80, “Non-Ionizing Radiation, Part 1: Static and Extremely Low-Frequency (ELF) Electric and Magnetic Fields,” 2002: ELF magnetic fields classified Group 2B, possibly carcinogenic to humans, on the basis of childhood leukaemia epidemiology, as described in ICNIRP 2010 [34] and WHO Fact Sheet 322 [35a]. https://publications.iarc.who.int/Book-And-Report-Series/Iarc-Monographs-On-The-Identification-Of-Carcinogenic-Hazards-To-Humans/Non-ionizing-Radiation-Part-1-Static-And-Extremely-Low-frequency-ELF-Electric-And-Magnetic-Fields-2002 (archived: https://web.archive.org/web/20260924134857/https://publications.iarc.who.int/Book-And-Report-Series/Iarc-Monographs-On-The-Identification-Of-Carcinogenic-Hazards-To-Humans/Non-ionizing-Radiation-Part-1-Static-And-Extremely-Low-frequency-ELF-Electric-And-Magnetic-Fields-2002)

    [35a] World Health Organization, “Electromagnetic fields and public health: Exposure to extremely low frequency fields,” Fact Sheet No. 322, June 2007. IARC classification based on “pooled analyses of epidemiological studies demonstrating a consistent pattern of a two-fold increase in childhood leukaemia associated with average exposure to residential power-frequency magnetic field above 0.3 to 0.4 µT” (3 to 4 milligauss); “the evidence related to childhood leukaemia is not strong enough to be considered causal.” Copy hosted by the Bonneville Power Administration: https://www.bpa.gov/-/media/Aep/lands/EMF_WHO_EMF-Fact-Sheet-2007a1.pdf (archived: https://web.archive.org/web/20261025155101/https://www.bpa.gov/-/media/Aep/lands/EMF_WHO_EMF-Fact-Sheet-2007a1.pdf)

    [36] Netherlands National Institute for Public Health and the Environment (RIVM), “Comparison of international policies on electromagnetic fields (power frequency and radiofrequency fields),” 2018, p. 8: “United States: No federal legislation is in force. In some states (Colorado, Connecticut, Hawaii, Maryland, Ohio), variations on the ‘prudent avoidance’ principle have been adopted. … In other states, fixed limits for the electric or magnetic field of power lines are set, varying from 20% to 240% of the reference level in the EU recommendation (Florida, Minnesota, Montana, New Jersey, New York, Oregon).” Illinois appears in neither list. https://www.rivm.nl/sites/default/files/2018-11/Comparison%20of%20international%20policies%20on%20electromagnetic%20fields%202018.pdf (archived: https://web.archive.org/web/20261025155410/https://www.rivm.nl/sites/default/files/2018-11/Comparison%20of%20international%20policies%20on%20electromagnetic%20fields%202018.pdf)

  • A Data Center Brings Its Grid With It. Which Grid Is the Question.

    A Data Center Brings Its Grid With It. Which Grid Is the Question.

    Part 1 of 13 in Thirteen Records. The long article, Data Centers Don’t Have an Environmental Record. They Have Thirteen of Them., rates thirteen kinds of environmental complaint against data centers. This series takes them one at a time.

    I work at a local ISP in Northern Illinois and co-founded FD-IX, an internet exchange. I have no customer, vendor, or interconnection relationship with any facility or developer named here and no financial position in any of them beyond broad-market index funds. My industry grows with infrastructure investment in a general way, which is an indirect interest; the full disclosure is at the top of the complete article.


    A data center burns nothing on a normal day. Its air quality record on that day is the record of the power plants that serve it, and those plants are not the same from one side of Illinois to the other. That is the first of the thirteen environmental records a data center carries, and it is the one most often argued from the wrong number.

    The wrong number arrives two ways. The opposition carries a coal-heavy average north from a region that does not serve the site. The industry carries the state’s nuclear share, which does not serve the new load either. Both sides are using an average where the question is about a margin. This post sorts three versions of the grid claim against EPA’s own emissions accounting, with the Northern Illinois subregion numbers in a table, and says plainly what I could not find: a marginal-emissions profile for any proposed Illinois facility.

    How the ratings work. Each complaint below is stated the way it usually arrives at a hearing and rated on the scale the full article uses. Systemic: documented at compliant facilities across multiple geographies. Regional: real, but only under specific geographic or operational conditions. Isolated: documented at one or few facilities due to misconduct or atypical design. Exaggerated: the concern is real, but the figures are permit ceilings or worst cases, not operating norms. Selective: a legitimate concern applied only to data centers, not to comparable land uses. Misattributed: the harm is real, but the source, geography, or cause is wrong. Contested: a plausible mechanism exists, but causal documentation at compliant facilities does not. Fabricated: no credible evidentiary basis exists. Where I say I found no record of something, that means a search of public sources through October 2026, not paid databases or records requests.


    Air Quality: The Grid

    Claim: A data center brings its grid’s emissions with it. Tier: Regional.

    True, and the size of it depends on which grid. eGRID 2023 shows a factor-of-four spread in NOx output across the subregions in the table below. [1] The subregion that includes ComEd’s Northern Illinois territory along with Ohio, Indiana, and parts of several neighboring states (RFCW) produces 0.422 lbs of NOx per megawatt-hour (MWh). The subregion that includes Missouri and Ameren’s downstate Illinois territory (SRMW) produces 0.787. Virginia’s subregion, SRVC, produces 0.282. The national average is 0.452. Across all subregions, the range runs from 0.083 in upstate New York to 8.139 in parts of Alaska.

    Grid RegionTerritoryNOx (lb/MWh)Sulfur dioxide, SO₂ (lb/MWh)
    SRMWSERC Midwest (Missouri, downstate Illinois under Ameren)0.7871.636
    RFCWRFC West (N. Illinois under ComEd, Ohio, Indiana, parts of neighboring states)0.4220.412
    U.S. NationalNational average0.4520.359
    SRVCSERC Virginia/Carolina (Virginia, Carolinas)0.2820.152
    RFCERFC East (Mid-Atlantic, not Virginia)0.2020.212
    NEWENew England0.2910.116

    Source: EPA eGRID 2023 Summary Tables [1]; territory assignments from EPA Power Profiler [1a]

    eGRID subregions are drawn for emissions accounting. They do not follow state lines, utility territories, or the footprints of PJM and MISO, the grid operators that actually dispatch the plants. EPA’s Power Profiler places Commonwealth Edison’s territory, which includes DeKalb, Kane, and most of Kendall County, in RFCW; Ameren Illinois territory downstate in SRMW; and the Quad Cities in MROW. For the Yorkville ZIP code, it returns either RFCW or SRMW depending on which utility serves the parcel. [1a] One state carries three subregion averages.

    Averages also are not the margin. The unit that serves new load varies by hour, node, congestion, and season, and I did not find PJM, MISO, EPA AVERT, or NREL Cambium data tying any proposed Illinois facility to a marginal-fuel profile, so I do not state one. Data center load growth as a grid planning and reliability problem is a separate question, covered in a separate piece on electricity.

    Claim: Data centers here will emit like they do in coal country. The reverse claim: Illinois is mostly nuclear, so a data center here is clean. Tier for both: Misattributed.

    Both carry the wrong average to a specific site. A site served by ComEd sits in RFCW at 0.422 lbs NOx per MWh; a site served by Ameren sits in SRMW at 0.787. [1][1a] An SRMW figure carried north is the wrong number in the wrong place. So is Illinois’s generation mix, 54.9% nuclear and 12.3% wind in eGRID’s 2023 state table, carried to any particular site. [1] Nuclear plants run as baseload, holding steady output around the clock rather than ramping to serve new demand, so the state’s clean production average is not what serves incremental load any more than the coal-heavy subregion average is.

    Claim: On-site gas generation is cleaner than the grid. Tier: Contested.

    This is the industry’s claim, and it has a real mechanism in the right place. In a coal-heavy subregion like SRMW, if a coal unit sets the margin at a given node and hour, a modern gas plant behind the meter can be cleaner than the unit it displaces. Establishing that takes hourly marginal-emissions data for the node, and I found no such analysis for any proposed facility. What holds without it is narrower: on-site gas puts a combustion source at the property line that grid service does not. That is a statement about where emissions land, not about the net total, and no party to an Illinois proceeding I reviewed has shown on-site generation reduces emissions relative to grid supply during the hours the facility would draw power. The Yorkville proposals avoid the question; Project Cardinal’s PUD agreement commits it to take all primary power from the ComEd grid. [11x]


    What to ask for. A council cannot change the grid, but it can ask the applicant to say which utility serves the parcel and therefore which subregion’s average applies, and it can decline to accept either side’s statewide figure in the record. Where an applicant proposes on-site gas generation as the cleaner option, ask for the hourly marginal-emissions analysis for the node that would support the claim. If none exists, the claim is Contested, and the one thing on-site generation does for certain is put a combustion source at the property line. Project Cardinal’s agreement commits it to grid power, which takes the question off the table in Yorkville. [11x] Make that commitment explicit in any approval where it is being assumed.

    What nobody knows. I found no hourly marginal-emissions analysis for any proposed facility in a coal-heavy subregion or in Illinois. With a facility’s load profile and generator emission rates, it would settle whether on-site generation is cleaner or dirtier than grid service at a given site, a question both sides argue from averages.

    This is part 1 of 13 in Thirteen Records, a series that takes the long article Data Centers Don’t Have an Environmental Record. They Have Thirteen of Them. one topic at a time. Next: diesel generators, the part of the Northern Virginia air quality problem that does and does not transfer.

    Cover photo: Wikideas1 / Wikimedia Commons, CC0


    Citations

    [1] U.S. EPA, eGRID 2023 Summary Tables, initial release January 15, 2025; rev2 released June 12, 2025 (summary tables PDF internal production date March 27, 2025). https://www.epa.gov/system/files/documents/2025-06/summary_tables_rev2.pdf (archived: https://web.archive.org/web/20261025155941/https://www.epa.gov/system/files/documents/2025-06/summary_tables_rev2.pdf). Three-decimal subregion output emission rates (Annual NOx and SO2, lb/MWh) as published on EPA’s eGRID Summary Data page, “eGRID with 2023 Data”: https://www.epa.gov/egrid/summary-data (archived: https://web.archive.org/web/20261017013542/https://www.epa.gov/egrid/summary-data). Table 4, “State Resource Mix (eGRID2023),” Illinois: total net generation 177,690,287 MWh; nuclear 54.9%, gas 16.0%, coal 15.3%, wind 12.3%, solar 1.1%.

    [1a] U.S. EPA, Power Profiler (eGRID 2023 data), subregion lookup by ZIP code and utility, read October 23, 2026. ZIP 60115 (DeKalb), 60178 (Sycamore), 60506 (Aurora), 61101 (Rockford), and 61068 (Rochelle) return RFCW; 61820 (Champaign), 62701 (Springfield), 61602 (Peoria), and 62002 (Alton) return SRMW; 61201 (Rock Island) returns MROW; 60560 (Yorkville) returns RFCW for Commonwealth Edison and SRMW for Ameren Illinois and Corn Belt Energy. https://www.epa.gov/egrid/power-profiler (archived: https://web.archive.org/web/20261025155519/https://www.epa.gov/egrid/power-profiler)

    [11x] United City of Yorkville, Ordinance No. 2025-77, approving the Planned Unit Development Agreement for Project Cardinal, passed November 10, 2025 (7-0), signed by the mayor November 13, 2025, published November 14, 2025; city-posted executed copy, mayor’s signature and clerk’s attestation dated November 13, 2025, Pioneer Development signature and date lines blank. Section 2.1: vesting applies “Upon commencement of the Project within three (3) years of the Effective Date.” Section 2.2: “Section 10-4-10 of the UDO is reserved for additional regulations applicable to Energy Industrial Uses. No new or amended standards, code provisions, or special regulations for Energy Industrial Uses shall apply to the Subject Property during the twenty (20) year vested term from the Effective Date of this Agreement, unless Developer agrees in writing or to the extent required by state or federal law.” No reference to Ordinance 2025-53. Section 2.14: “seventy-eight (78) feet, inclusive of any rooftop mechanical equipment or appurtenances.” Section 3.5: water obligations “addressed exclusively in the Utility Agreement.” https://www.yorkville.il.us/DocumentCenter/View/13587/Ordinance-2025-77—record?bidId= (archived: https://web.archive.org/web/20261025151237/https://www.yorkville.il.us/DocumentCenter/View/13587/Ordinance-2025-77—record?bidId=). Annexation agreement, Ordinance No. 2025-78: https://www.yorkville.il.us/DocumentCenter/View/13588/Ordinance-2025-78—record?bidId= (archived: https://web.archive.org/web/20261025151421/https://www.yorkville.il.us/DocumentCenter/View/13588/Ordinance-2025-78—record?bidId=). Packet version: City Council Packet, November 10, 2025 (ArchiveCenter Item 6499), Planned Unit Development Agreement between the United City of Yorkville and Pioneer Development, LLC (Project Cardinal), packet pp. 272 to 290. Section 2.1: entitlements “fully vested and protected from amendments and changes to City ordinances, codes, or regulations for a period of twenty (20) years from the Effective Date.” Section 2.2: “No new or amended standards, code provisions, or special regulations for Energy Industrial Uses shall apply to the Subject Property during the twenty (20) year vested term from the Effective Date of this Agreement, unless Developer agrees in writing or to the extent required by state or federal law.” Section 2.3: approximately ten-year build-out; Phasing Plan “advisory only and non-binding.” Section 2.4: “All data center buildings shall be at least five hundred feet (500′) from the nearest residential or commercial structure outside the boundaries of the Subject Property,” measured “from existing, occupied, residential or commercial buildings as of the date of PUD approval.” Section 2.10: 100-foot Transition Zone Type D buffer with a 12-foot berm facing residential properties and 8 feet elsewhere; “No additional berms or landscape requirements shall be imposed unless Developer agrees in writing.” Section 2.11: “the most appropriate location for Mechanical Equipment is on the rooftops; therefore, whenever practical, mechanical equipment shall be placed on the rooftops”; project subject to the City Noise Ordinance “as it existed when the PUD application was approved by the City Council.” Section 2.14: 78-foot maximum height including rooftop equipment. Section 2.17: “all primary power used for the data center campus on the Subject Property will be delivered from the Commonwealth Edison power grid” unless the City Council approves otherwise. Section 3.4: continuous noise monitoring devices at the onset of each construction phase, a preliminary report within 60 days after each building is operational, devices maintained for the life of the project. Section 3.11: operational testing of generators “during the hours of 11:00 a.m. to 5:00 p.m., Monday through Friday, and not on any Holidays.” https://www.yorkville.il.us/ArchiveCenter/ViewFile/Item/6499 (archived: https://web.archive.org/web/20261025154939/https://www.yorkville.il.us/ArchiveCenter/ViewFile/Item/6499)

  • Why Electric Bills Really Rose, and What It Means for Data Centers

    Why Electric Bills Really Rose, and What It Means for Data Centers

    High-voltage electric transmission towers along a suburban road in Buffalo Grove, Illinois with a utility truck visible
    High-voltage transmission towers in the Chicago suburbs. Photo: 1250metersdeep / Wikimedia Commons (CC0).

    AI tools were used in the research, drafting, and editing of this article. All factual claims are sourced to primary documents and verified by the author.

    Since publishing my original article on what data centers mean for our region, many readers have asked whether these facilities are responsible for higher electric bills. This article explains how Illinois’ electricity system actually works, why prices rose across PJM, and what is being done to stabilize costs.

    This article is part of the broader series “What Data Centers Actually Mean for Northern Illinois Communities”. It focuses specifically on electricity – giving residents, officials, and skeptical readers a complete, source-rich breakdown of this topic without needing to sift through the whole overview piece.


    How the electric system works

    Every electric bill has two main components:

    • Delivery – the poles, wires, substations, and maintenance regulated by the Illinois Commerce Commission (ICC) [39].
    • Supply – the energy you use, priced through PJM Interconnection’s wholesale electricity markets [40].

    PJM manages the reliability of a 13-state grid. Each year it runs a capacity auction that pays power plants to be available during peak demand three years in advance [41]. These payments function like a hospital keeping extra beds staffed during flu season – not because they’re needed every day, but because they must be ready for unexpected surges [42].


    Why prices rose – the regional imbalance

    For nearly a decade, PJM had more generating capacity than it needed [43]. That changed in the mid-2020s as three forces reshaped the grid:

    1. Plant retirements. PJM reports significant coal and natural-gas retirements across the region in the 2023–2027 period [44]. 2. Higher reliability margins. PJM raised its Installed Reserve Margin (IRM) from ~18% to just over 19% for the 2026/27 auction [45], which translates to several additional gigawatts of required dependable capacity across a 140–150 GW system [64]. 3. Renewable derating. PJM’s ELCC ratings show that wind and solar only count at a fraction of nameplate capacity – onshore wind at ~21–38%, and solar at ~14–50% depending on year and configuration [67].

    Meanwhile, PJM’s demand forecast added several gigawatts of new load, including data centers, EV manufacturing, and general growth [47]. But this increase was far smaller than the dependable supply removed by retirements, higher reserve requirements, and derating.

    Bottom line: PJM faced a structural shortfall – several gigawatts of new demand versus well over ten gigawatts of effective supply lost on paper. That imbalance, not local projects, drove capacity prices higher across the region [49].


    Why Illinois moved with everyone else

    Illinois retained its nuclear fleet (Byron, Braidwood, and Dresden), which helps regional reliability. But because PJM sets capacity prices for the entire multi-state system, any shortfall anywhere raises costs everywhere:

    • PJM allocates reliability costs region-wide [51].
    • Higher auction prices flow through to all load-serving entities, including ComEd.

    Illinois didn’t pay for other states’ mistakes – it paid for its share of regional reliability insurance.


    What the headlines got wrong

    Recent news stories often blamed data centers for rising bills. That narrative was catchy but inaccurate.

    • The cost increase was regional, not local.
    • The main drivers were retirements, higher reserve margins, and renewable derating.
    • Illinois does not subsidize big-tech hookups; ICC rules require large users to pay their own interconnection costs.
    • Homes and hospitals get priority during emergencies; large users curtail or self-supply first.
    • Capacity auctions can show sharp local price effects even when system-wide demand from data centers remains modest.

    Oversimplified coverage distorted a complex, 13-state reliability issue into a single cause.


    Regulatory and legislative responses – and the role of CUB

    Illinois and federal agencies are responding to this reliability gap:

    • Clean and Reliable Grid Act (2025) repealed the state’s nuclear moratorium and authorizes advanced reactors [52].
    • Grid-scale storage incentives support battery deployment.
    • ComEd Multi-Year Plan (ICC 24-0181) funds grid modernization and replacement of aging infrastructure [53].
    • Federal actions include DOE loan programs and FERC Order 1920 on long-distance transmission [54].

    This process has been contentious. CUB notes that the ICC ultimately cut 65% of ComEd’s proposed $1.47B increase after finding excessive capital spending [55]. That kept bills lower in the short term, but delaying upgrades also contributed to infrastructure strain across the region.


    Local construction, consumer protection, and who pays for upgrades

    Illinois law draws a firm line between:

    • Shared grid improvements (rate-funded), and
    • Customer-specific capacity additions (customer-funded).

    Under PJM and ICC rules:

    • Large users pay 100% of their interconnection costs [56][58].
    • ComEd confirms that new large load must pay for its own tie-ins and load-specific upgrades [59].
    • Pending legislation (SB 2181 / HB 4120) would enhance usage reporting and strengthen ICC oversight [60].

    Residential customers do not subsidize corporate hookups.


    Who gets priority during grid stress

    Emergency plans are unambiguous:

    • Homes, hospitals, and essential services are treated as firm load under NERC rules [61].
    • Many large industrial facilities – especially data centers – take interruptible or curtailable service and operate backup generation [62].
    • In practice, large users curtail first, preserving neighborhood reliability.

    The idea that industry gets priority over residents is simply false.


    Consumer impact – and how to read your bill

    A typical household uses ~800–900 kWh per month with a bill in the low-$100s [63].

    Delivery: 45–50% – ComEd infrastructure and maintenance (ICC-regulated) Supply: 40–45% – Energy + PJM capacity costs Taxes & Riders: 5–10% – State and municipal programs

    2024–2026 cost drivers

    Driver Monthly impact Notes PJM reliability / capacity +$8–12 Region-wide tightening [64] Delivery modernization +$5–6 ICC 24-0181 State policy riders +$1–2 Various programs Data-center load ~$0–$2 Modest system impact; localized auction effects in some zones [66]

    PJM’s Market Monitor found that data center load affected the 2026/27 capacity auction in certain pockets [66], but that effect occurred on top of the region-wide shortfall created by retiring plants and increased reserve requirements.


    The nuclear revival

    Nuclear power remains the backbone of Illinois’ reliability. With the moratorium lifted, the state can now pursue both advanced large reactors and small modular reactors (SMRs) [52]. These plants:

    • Provide multi-day onsite fuel
    • Deliver stable operating costs
    • Offer high reliability value in PJM
    • Reduce dependence on natural gas
    • Fit well into Illinois’ existing transmission corridors

    As the state maintains its existing fleet and explores new nuclear development, nuclear energy will be central to long-term cost stability and grid security.


    Myths vs. facts

    Myth: “Data centers caused bills to spike.” Fact: The major drivers were retirements, higher reserve margins, and renewable derating. Data centers influenced one auction year in some pockets but were not the primary region-wide cause [66].

    Myth: “Industry gets power before homes.” Fact: Homes and hospitals are firm load; large users curtail and rely on generators during emergencies [61][62].

    Myth: “Ratepayers fund corporate hookups.” Fact: ICC and PJM rules require large customers to fund their own interconnections [58][59].

    Myth: “ComEd raises rates whenever it wants.” Fact: All delivery rates require ICC review and public comment.

    Myth: “Renewables can replace all firm generation.” Fact: PJM’s ELCC shows wind and solar count only partially toward reliability, making firm resources essential [67].


    Looking ahead

    Illinois and PJM are rebuilding the dependable capacity that keeps the lights on. Grid modernization, advanced nuclear, and long-distance transmission planning should gradually ease costs over the late 2020s. Higher bills today reflect the cost of rebuilding reliability after years of under-investment – not the result of recent development. Data centers did not create the structural shortfall; in many cases, they help fund the solutions.

    Methods & Transparency

    I utilize a range of AI and automation tools, in conjunction with my own research, to organize and verify complex public data – from DeKalb County tax rolls and DevNet parcel records to PJM TEAC maps and ComEd reliability filings. ChatGPT has been the primary workhorse for synthesis, but I also utilize Copilot, Gemini, Claude, and Grok to cross-check facts, refine tone, and develop Python-based tools for analysis. Grammarly keeps the writing clear – I use it for nearly everything I write, even texts.

    Over the past several months, I’ve invested well over 100 hours reviewing, verifying, and refining this information. I have also permanently archived more than 100 key source documents in the Internet Archive’s Wayback Machine to ensure transparency and durability. The work is still ongoing as new filings and community feedback come in.

    Every figure and citation is sourced from public records that you can verify independently. My goal is to make complex infrastructure and taxation topics accessible and understandable to everyone in the community. I’m just a local guy with a day job and a family, trying to make the public data we already have a little easier for everyone to understand.

    This article is part of the Data Centers: The Public Record series. View all technical analysis →


    [39] ComEd Multi-Year Rate Plan Order (Docket 24-0181), p. 13 – Delivery Service Rates under ICC Jurisdiction. https://web.archive.org/web/20251112/https://www.icc.illinois.gov/docket/P2024-0181

    [40] PJM Manual 18 – Capacity Market Overview, §1.2 “Role of PJM,” p. 5. https://web.archive.org/web/20251112/https://www.pjm.com/library/manuals.aspx

    [41] PJM Capacity Market Fact Sheet – “Promoting Future Reliability,” Base Residual Auction (BRA). https://web.archive.org/web/20251112/https://www.pjm.com/-/media/DotCom/about-pjm/newsroom/fact-sheets/pjm-capacity-market-promoting-future-reliability-fact-sheet.pdf

    [42] FERC Order No. 719 – Wholesale Market Design and Reliability Principles, p. 6 ¶12. https://web.archive.org/web/20251112/https://www.ferc.gov/sites/default/files/2020-05/E-16_19.pdf

    [43] State of the Market Report for PJM 2023, Volume 1, p. 15, Figure 3. https://web.archive.org/web/20251112/https://www.monitoringanalytics.com/reports/PJM_State_of_the_Market/2023.shtml

    [44] PJM Generation Deactivation Fact Sheet, Table: Deactivations 2023–2027. https://web.archive.org/web/20251112/https://www.pjm.com/-/media/DotCom/about-pjm/newsroom/fact-sheets/generation-deactivation-fact-sheet.pdf

    [45] 2026/2027 PJM BRA Planning Period Parameters, p. 2 (IRM ~19%). https://web.archive.org/web/20251015/https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2026-2027/2026-2027-planning-period-parameters-for-base-residual-auction-pdf.pdf

    [46] NERC Long-Term Reliability Assessment (LTRA), 2024, p. 26 – ELCC by Resource Class. https://web.archive.org/web/20251112/https://www.nerc.com/pa/RAPA/ra/Pages/default.aspx

    [47] PJM 2024 Load Forecast Report, p. 8 – Non-Coincident Peak Load Growth. https://web.archive.org/web/20251112/https://www.pjm.com/-/media/DotCom/library/reports-notices/load-forecast/2024-load-report.pdf

    [48] 2026–2027 Base Residual Auction Report, p. 4 – Supply vs. Demand Balance. https://web.archive.org/web/20251112/https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2026-2027/2026-2027-bra-report.pdf

    [49] Utility Dive – “PJM Auction Clears at Record Price Amid Reliability Concerns,” May 15, 2024. https://web.archive.org/web/20251112/https://www.utilitydive.com/news/pjm-capacity-auction-2026-2027/716812/

    [50] (Removed – unused in final text)

    [51] PJM Manual 28 – Billing, Settlements, and Credit Requirements, §2.3 “Locational Cost Allocation,” p. 12. https://web.archive.org/web/20251112/https://www.pjm.com/-/media/documents/manuals/m28.ashx

    [52] Public Act 103-0721 – SB 3104 (Clean and Reliable Grid Act), Sec. 5 – Repeal of Nuclear Moratorium. https://web.archive.org/web/20251112/https://www.ilga.gov/legislation/publicacts/fulltext.asp?Name=103-0721

    [53] ICC Docket 24-0181 – ComEd Multi-Year Rate Plan (2024–2027), Order pp. 142–143. https://web.archive.org/web/20251112/https://www.icc.illinois.gov/docket/P2024-0181

    [54] FERC Order No. 1920 – Transmission Planning and Cost Allocation, Appendix A. https://web.archive.org/web/20250920/https://www.ferc.gov/media/e-1

    [55] Citizens Utility Board – “Update on Cases Involving ComEd and Ameren Illinois,” June 28, 2024. https://web.archive.org/web/20240628170000/https://www.citizensutilityboard.org/blog/2024/06/28/update-on-cases-involving-comed-ameren-illinois-power-bills/

    [56] PJM Manual 14A – Generator & Transmission Interconnection Process, §10.2 “Cost Responsibility,” p. 46. https://web.archive.org/web/20251112/https://www.pjm.com/-/media/documents/manuals/m14a.ashx

    [57] 83 Ill. Adm. Code Part 466 – Electric Utility Interconnection Standards, § (b)(3). https://web.archive.org/web/20251112/https://www.ilga.gov/commission/jcar/admincode/083/08300466sections.html

    [58] ICC Staff Brief on Exceptions, Docket 24-0181 (Cons. 22-0486 / 23-0055), p. 56 ¶3. https://web.archive.org/web/20251112/https://www.icc.illinois.gov/docket/P2024-0181/documents/352943/files/617754.pdf

    [59] ComEd Filing #620670 – Kormos Testimony, Docket 24-0181 (July 2024), p. 9. https://web.archive.org/web/20251112203536/https://www.icc.illinois.gov/docket/P2024-0181/documents/354434/files/620670.pdf

    [60] SB 2181 (2025) – Data Center Energy & Water Reporting; HB 4120 – Utilities-Various. https://web.archive.org/web/20251112/https://www.ilga.gov/legislation/BillStatus.asp?DocNum=2181&GAID=18&DocTypeID=SB&SessionID=114&LegID=161884

    [61] NERC Standard EOP-011-2 – Emergency Operations, R1.1. https://web.archive.org/web/20251112/https://www.nerc.com/_layouts/15/PrintStandard.aspx?standardnumber=EOP-011-2

    [62] ComEd Current Rate Book – Interruptible Service (IS) & Load Response (LR), Sheet 271. https://web.archive.org/web/20251112/https://www.comed.com/SiteCollectionDocuments/MyAccount/MyBillUsage/CurrentRateBook.pdf

    [63] EIA FAQ – Average Monthly Electric Consumption per U.S. Household. https://web.archive.org/web/20251112/https://www.eia.gov/tools/faqs/faq.php?id=97&t=3

    [64] 2026/2027 PJM Planning Period Parameters, p. 2 (IRM). https://web.archive.org/web/20251015/https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2026-2027/2026-2027-planning-period-parameters-for-base-residual-auction-pdf.pdf

    [65] PJM 2025 Long-Term Load Forecast Report, pp. 12–14 (ComEd Zone & data center adjustments). https://web.archive.org/web/20251112/https://www.pjm.com/-/media/DotCom/library/reports-notices/load-forecast/2025-load-report.pdf

    [66] Monitoring Analytics – “Analysis of the 2026/2027 RPM Base Residual Auction (Part A),” Oct. 1, 2025. https://web.archive.org/web/20251112/https://www.monitoringanalytics.com/reports/Reports/2025/IMM_Analysis_of_the_20262027_RPM_Base_Residual_Auction_Part_A_20251001.pdf

    [67] PJM ELCC Class Ratings for 2024/2025 and 2025/2026. https://web.archive.org/web/20250930094019/https://www.pjm.com/-/media/DotCom/planning/res-adeq/elcc/elcc-class-ratings-for-2024-2025.ashx